London

HMO licensing in Redbridge

London Borough of Redbridge requires a mandatory licence for HMOs occupied by 5 or more people from 2 or more households. It also runs additional licensing (bringing smaller HMOs into licensing) and selective licensing (covering other privately rented homes in designated areas). The published licence fee starts at £1,865.34.

Mandatory licence

5+ people, 2+ households

National scheme

Additional / selective

Additional + Selective

Council-designated schemes

Licence fee

From £1,865.34

Decision time

About 13 weeks

The council's stated aim

Licensing schemes in Redbridge

In force
Additional licensing

Redbridge's borough-wide additional HMO licensing scheme (HMOs with 3 or more occupiers not covered by mandatory licensing) came into force on 18 September 2023 and ceases on 17 September 2028. Two selective licensing schemes also apply: Scheme 3 (Ilford Town and Valentines) from 1 November 2023, reported to end 31 October 2028, and Scheme 4 (15 further wards) from 8 April 2024 to 7 April 2029.

In force from
18 September 2023
Scheme ends
17 September 2028
Council source

Verified 24 September 2026

Licence fees

The published fee for a new HMO licence is £1,865.34. Fees can depend on the number of occupants or lettings, and they are reviewed each year.

Mandatory HMO licence, 2 households (smallest case), applications 1 April 2026 - 31 March 2027: first stage £696.14 (at application) + second stage £1,169.20 = £1,865.34. Second stage scales by households: 3 = £1,273.46 (total £1,969.60), 4 = £1,392.28 (£2,088.42), 5 = £1,489.81 (£2,185.95), 6 = £1,600.79 (£2,296.93), 7 = £1,705.04 (£2,401.18), 8 = £1,810.42 (£2,506.56), 9 = £1,921.39 (£2,617.53), 10+ = £2,032.37 (£2,728.51). Paper application surcharge £139.23. £35 accredited-landlord discount off second stage (not applied).

Fee source: redbridge.gov.uk (checked 2 October 2026). Fees change during the year, so check the council before you apply.

Additional and selective licence fees

Fees for council-designated schemes are set separately from the mandatory HMO fee. Figures are the standard full-rate fee for a new licence, before any discounts.

Additional licence

£1,865.34

Ranges from £1,865.34 to £2,728.51

Additional HMO licence (3-4 occupants, 2+ households, borough-wide), applications 1 April 2026 to 31 March 2027, base case of 2 households: first stage £696.14 + second stage £1,169.20. Fee rises with the number of households.

£35 off the second-stage fee with proof of landlord accreditation. Extra £139.23 for paper applications.

Scheme: From 18 September 2023 to 17 September 2028

Checked 2 October 2026 against redbridge.gov.uk

Selective licence

£997.69

Selective licence for one privately rented property, applications 1 April 2026 to 31 March 2027: £371.05 on application + £626.64 if successful. Same fee for Scheme 3 (Valentines and Ilford Town wards) and Scheme 4 (15 other wards).

£35 off the second payment with proof of accreditation (second payment £591.64). Extra £139.23 for paper applications.

Checked 2 October 2026 against redbridge.gov.uk

Minimum room sizes

Double bedroom (2 persons aged 10+)10.22 m² minimum floor area (national HMO space standard, SI 2018/616).
Single bedroom (1 person aged 10+)6.51 m² minimum floor area (national HMO space standard, SI 2018/616).
Any room used as sleeping accommodationRedbridge's own mandatory HMO licence conditions state the licence holder must not permit any room with a floor area of less than 4.64 m² to be used as sleeping accommodation at all.

National minimums for licensed HMOs are 6.51 m² for one adult and 10.22 m² for two adults; councils can apply higher local standards.

Fire safety requirements

  • Grade A, LD2 fire detection required in HMOs of 3+ storeys; Grade D, LD2 in HMOs of up to 2 storeys.
  • 30-minute fire-resisting doors (FD30S) with self-closing devices and intumescent seals required on bedrooms and rooms opening onto escape routes.
  • Staircase soffits must be lined with 12.5mm plasterboard to provide 30 minutes' fire resistance.
  • All final exit doors must be fitted with locks openable from the inside without a key.
  • Window restrictors required on first-floor windows and above, limiting opening to 100mm.
  • Fire blankets required in shared kitchens and in bedsitting rooms containing cooking facilities.
  • Any fire-safety works required by the licence must be completed within 2 calendar months of the licence being granted.

Kitchen, bathroom and amenity standards

  • Adequate kitchen and bathroom facilities must be provided, having regard to the number of occupiers, under the council's approved HMO standards.
  • Common areas must be inspected and cleaned monthly; individual lettings inspected at least every 6 months.
  • Adequate arrangements for the storage and disposal of household waste.

Documents you will need

  • Gas safety certificate (CP12) — Current annual Gas Safety Record for all gas appliances; must be produced to the council within 21 days of a request.
  • EICR / electrical safety proof — PAT testing declaration and proof the electrical installation is safe, per the council's mandatory licence conditions.
  • Fire risk assessment — A current Fire Risk Assessment record must be kept on the property and produced on request.
  • EPC — Valid Energy Performance Certificate for the property.

Sources

Compiled from the council’s own published pages and documents; data reviewed September 2026. Rules and fees change, so always confirm with London Borough of Redbridge before applying. This is general information, not legal advice.

More councils in London