South East

HMO licensing in Southampton

Southampton City Council requires a mandatory licence for HMOs occupied by 5 or more people from 2 or more households. It also runs additional licensing, which brings smaller HMOs (typically 3 or 4 people) into licensing. The published licence fee starts at £953.

Mandatory licence

5+ people, 2+ households

National scheme

Additional / selective

Additional

Council-designated schemes

Licence fee

From £953

Decision time

Not published

Licensing schemes in Southampton

In force
Additional licensing

Southampton's Additional HMO Licensing scheme covers smaller (3-4 person) HMOs in nine wards: Bevois, Bargate, Banister & Polygon, Portswood, Swaythling, Shirley, Bassett, Freemantle and Millbrook. It came into force on 1 October 2025 and ends on 30 September 2030.

In force from
1 October 2025
Scheme ends
30 September 2030
Council source

Verified 24 September 2026

Licence fees

The published fee for a new HMO licence is £953. Fees can depend on the number of occupants or lettings, and they are reviewed each year.

The standard fee for a timely, compliant HMO licence application is £953, paid in two stages: £300 at stage one (the application, non-refundable) and £653 at stage two (due after the council's notice of intention to grant a licence). A reduced rate of £636 (£300 then £336) applies where the landlord uses an independent HMO surveyor. Applications received after the three-month deadline cost £1,618 (£300 then £1,318). Private providers of large student accommodation who belong to ANUK, or follow another approved code, get 50% off the fees. A separate renewal fee is not listed, so confirm it with the council before renewing.

Fee source: southampton.gov.uk (checked 8 October 2026). Fees change during the year, so check the council before you apply.

Additional and selective licence fees

Fees for council-designated schemes are set separately from the mandatory HMO fee. Figures are the standard full-rate fee for a new licence, before any discounts.

Additional licence

No single standard fee

The current additional licence fee is not shown here yet. Check the council’s fees page for the current charge.

Scheme: From 1 October 2025 to 30 September 2030

Checked 2 October 2026 against southampton.gov.uk

Documents you will need

  • Gas safety certificate (CP12) — Within the last 12 months for every gas appliance on the property.
  • EICR — Electrical Installation Condition Report, dated within the last five years.
  • EPC — Valid Energy Performance Certificate for the property.
  • Floor plan with room dimensions — To scale, showing every room and its floor area against the HMO minimums.
  • Fire risk assessment — Current assessment of the property's means of escape, alarms and compartmentation.

Sources

Compiled from the council’s own published pages and documents; data reviewed September 2026. Rules and fees change, so always confirm with Southampton City Council before applying. This is general information, not legal advice.

More councils in South East