London

HMO licensing in Hammersmith & Fulham

London Borough of Hammersmith & Fulham requires a mandatory licence for HMOs occupied by 5 or more people from 2 or more households. It also runs additional licensing (bringing smaller HMOs into licensing) and selective licensing (covering other privately rented homes in designated areas). The published licence fee starts at £1,656.

Mandatory licence

5+ people, 2+ households

National scheme

Additional / selective

Additional + Selective

Council-designated schemes

Licence fee

From £1,656

Decision time

Not published

Licensing schemes in Hammersmith & Fulham

In force
Additional licensing

Borough-wide additional HMO licensing (renewed scheme) is in force from 5 June 2022 until 4 June 2027. The selective licensing scheme covering 24 designated streets has the same dates (5 June 2022 to 4 June 2027). Both expire in under nine months and no renewal consultation had been published on the council's site at the date checked, so landlords should watch for one.

In force from
5 June 2022
Scheme ends
4 June 2027
Council source

Verified 24 September 2026

Licence fees

The published fee for a new HMO licence is £1,656. Fees can depend on the number of occupants or lettings, and they are reviewed each year.

Mandatory HMO licence: £1,656 for a 5-bedroom HMO plus £183 for each additional bedroom. Additional HMO licence: £755 flat fee. Selective licence: £755 flat fee. A £80 discount is available for landlords accredited with a recognised body (e.g. NRLA, London Landlord Accreditation Scheme) or a £50 discount for signing the council's landlord rental charter; only one discount can be applied per licence. Payment must be made online; the council does not accept cheques or cash. No separate renewal fee or Part A/B instalment split is published.

Fee source: lbhf.gov.uk. Fees change during the year, so check the council before you apply.

Additional and selective licence fees

Fees for council-designated schemes are set separately from the mandatory HMO fee. Figures are the standard full-rate fee for a new licence, before any discounts.

Additional licence

£755

Additional HMO licence, flat fee (the council publishes a single fee, not varied by occupant numbers); payable online in full with the application

£80 discount for members of an accredited landlord body (e.g. NRLA, London Landlord Accreditation Scheme) or £50 discount for signing up to the landlord rental charter as part of the application; only one discount applies per licence.

Scheme: From 5 June 2022 to 4 June 2027

Checked 2 October 2026 against lbhf.gov.uk

Selective licence

£755

Selective licence for a single privately rented dwelling on one of the 24 designated streets, flat fee

£80 discount for members of an accredited landlord body (e.g. NRLA, London Landlord Accreditation Scheme) or £50 discount for signing up to the landlord rental charter as part of the application; only one discount applies per licence.

Checked 2 October 2026 against lbhf.gov.uk

Minimum room sizes

Single bedroom6.5 m² minimum for one person where there is a separate reception room of at least 11 m² (or 16 m² if kitchen and lounge are combined); otherwise 10.2 m² minimum where there is no separate reception room, and 10.2 m² for a bedsit with its own kitchen facilities (LBHF Standards and Guidance for HMOs).
Double bedroom10.2 m² minimum for two people co-habiting as a couple where there is a separate reception room; 15 m² where there is no separate reception room or where the room is a bedsit with its own kitchen facilities (LBHF Standards and Guidance for HMOs).

National minimums for licensed HMOs are 6.51 m² for one adult and 10.22 m² for two adults; councils can apply higher local standards.

Fire safety requirements

  • 30-minute fire-resistant doors (with intumescent strips, cold smoke seals, self-closers and thumb-turn locks) are required on all doors opening onto the protected escape route other than bathrooms/WCs.
  • Two-storey bedsit HMOs require a Grade D, LD2 mains-wired interlinked smoke/heat alarm system; three-or-more-storey HMOs require a Grade A, LD2 system with a control panel, sounders and manual call points, to BS 5839 Part 6.
  • Emergency lighting to BS 5266 is mandatory for 3+ storey HMOs with dark or complex escape routes and for all bedsit-type HMOs.
  • A Fire Risk Assessment must be carried out and regularly reviewed under the Regulatory Reform (Fire Safety) Order 2005 by a 'responsible person' or competent professional.
  • All furniture and furnishings supplied with the letting must comply with the Furniture and Furnishings (Fire)(Safety) Regulations 1988.

Kitchen, bathroom and amenity standards

  • One bathroom/shower room, one toilet and one wash hand basin is required for up to 4 occupants, rising to 2 toilets for 6-9 occupants and 2 bathrooms plus 3 toilets for 10+ occupants.
  • Shared kitchens need one cooker, sink and 245-litre fridge/freezer per 5 occupants, with minimum kitchen size scaling from 4 m² (up to 4 people) upward, or a combined kitchen/lounge of at least 12.5-16 m² depending on occupancy.
  • Fixed space heating must maintain at least 21°C in habitable rooms/bathrooms and 18°C elsewhere when it is -1°C outside; fixed electric heaters in older solid-wall properties are only acceptable in small rooms (up to 9.3 m²) meeting strict insulation and exposure conditions.
  • Suitable refuse and recycling storage must be provided per household (minimum 200 litres refuse / 160 litres recycling for 1-3 people, scaling up for larger households), kept off the public highway outside collection times.
  • Electrical installations must be inspected and tested at least every 5 years under the Electrical Safety Standards in the Private Rented Sector Regulations 2020.

Documents you will need

  • Gas safety certificate (CP12) — Annual check by a Gas Safe engineer; copy provided to each tenant within 28 days and kept for 2 years.
  • EICR — Electrical Installation Condition Report at intervals of no more than 5 years.
  • EPC — Valid Energy Performance Certificate of E or above, unless a registered exemption applies.
  • Floor plans — Plans of the property showing room sizes, required for mandatory and additional licence applications (hand-drawn plans accepted if legible).
  • Fire risk assessment — Assessment of means of escape, alarms and fire precautions under the Regulatory Reform (Fire Safety) Order 2005.

Sources

Compiled from the council’s own published pages and documents; data reviewed September 2026. Rules and fees change, so always confirm with London Borough of Hammersmith & Fulham before applying. This is general information, not legal advice.

More councils in London