London

HMO licensing in Greenwich

Royal Borough of Greenwich requires a mandatory licence for HMOs occupied by 5 or more people from 2 or more households. It also runs additional licensing (bringing smaller HMOs into licensing) and selective licensing (covering other privately rented homes in designated areas). The council does not publish a single licence fee, so check its fees page.

Mandatory licence

5+ people, 2+ households

National scheme

Additional / selective

Additional + Selective

Council-designated schemes

Licence fee

Not published

Decision time

Not published

Licensing schemes in Greenwich

Proposed
Selective licensing

Royal Greenwich consulted from 21 July to 12 October 2026 on a new 5-year selective licensing scheme covering 17 wards plus part of Woolwich Arsenal (18 areas), up from the five wards currently covered. The consultation window has now closed; a Cabinet report and decision are still pending, expected towards the end of 2026. The existing selective scheme (Woolwich and Plumstead) began on 1 October 2022 and is understood to run to 30 September 2027; a borough-wide additional HMO scheme has run since 1 January 2024 (to 31 December 2028).

Announced
21 July 2026
Consultation closes
12 October 2026
Council source

Verified 19 October 2026

Licence fees

Royal Borough of Greenwich does not publish a single figure we could confirm. Fees are set by the council and reviewed each year, so check its fees page.

Published per-letting rate only: HMO licence up to 5 lettings = £527.82 per letting; 6 or more lettings = £527.82 per letting for the first 5 plus £316.69 for every extra letting. Selective licence £905.75 (separate). Fees VAT exempt. Paid in 2 stages: first half on application, remainder when the draft licence is issued; no instalment plans.

Fee source: royalgreenwich.gov.uk (checked 2 October 2026). Fees change during the year, so check the council before you apply.

Additional and selective licence fees

Fees for council-designated schemes are set separately from the mandatory HMO fee. Figures are the standard full-rate fee for a new licence, before any discounts.

Additional licence

No single standard fee

Additional HMO licence: the council publishes a rate of £527.82 per letting (£316.69 for each additional letting beyond five), paid in two stages. It does not publish a single standard total.

No discounts or separate renewal fee are shown on the council's current fee page. Fee is VAT exempt; no instalment plans are offered. For larger HMOs the rate is £527.82 per letting for the first 5 lettings and £316.69 for each additional letting.

Scheme: From 1 January 2024

Checked 2 October 2026 against royalgreenwich.gov.uk

Selective licence

£905.75

Selective licence for a single privately rented dwelling in the designated area, full fee, paid in two stages (half on application, half when the draft licence is issued)

No discounts or separate renewal fee are shown on the council's current fee page. Fee is VAT exempt; no instalment plans are offered.

Scheme: From 1 October 2022

Checked 2 October 2026 against royalgreenwich.gov.uk

Minimum room sizes

Single bedroom6.51 m² minimum for one person aged over 10 (4.64 m² for a child under 10); any room under 4.64 m² can never be used as sleeping accommodation (Royal Borough of Greenwich HMO Licence Conditions, mandatory condition 2.7, per Housing Act 2004 Sch 4).
Double bedroom10.22 m² minimum for two people aged over 10 (Royal Borough of Greenwich HMO Licence Conditions, mandatory condition 2.7, per Housing Act 2004 Sch 4).

National minimums for licensed HMOs are 6.51 m² for one adult and 10.22 m² for two adults; councils can apply higher local standards.

Fire safety requirements

  • Smoke alarms must be installed on every storey with living accommodation (bathrooms/lavatories count as living accommodation), with a heat detector/alarm in kitchens, to BS 5839 Part 6:2013.
  • A carbon monoxide alarm is required in any room with a solid fuel appliance or gas appliance (including boilers), kept in proper working order.
  • Fire doors must be sound, fitted with 100mm butt hinges, intumescent strips and cold smoke seals, a working self-closer, and a gap of no more than 3mm between door and frame; the licence holder must certify compliance within 3 months and supply manufacturer/third-party certification within 12 months.
  • The manager must produce a fire risk assessment under the Regulatory Reform (Fire Safety) Order 2005 and supply it to the council on demand, and must notify the council of any fire at the property within 72 hours.
  • All soft furnishings must comply with the Furniture and Furnishings (Fire)(Safety) Regulations 1988 (as amended), confirmed by signed declaration within 3 months of the licence being issued.

Kitchen, bathroom and amenity standards

  • Room sizes, kitchen facilities, washing facilities and heating standards must meet the Royal Borough's adopted 'Standards for Houses in Multiple Occupation' for the duration of the licence.
  • Gas appliances must be serviced annually and a current gas safety certificate produced to the council each year; the gas and electricity supply must not be via a prepayment meter.
  • Electrical installations must be tested and a current EICR held (5-year interval), with any low-risk remedial works completed within 2 years of the licence or by EICR expiry, whichever is sooner.
  • A valid EPC is required, and if rated below E the licence holder must complete improvement works within 12 months or register a valid exemption within 3 months.
  • Suitable and adequate refuse/recycling receptacles must be provided both within and outside the property in line with the council's waste and recycling scheme.

Documents you will need

  • Gas safety certificate (CP12) — Renewed annually and produced to the council each year for inspection.
  • EICR — Electrical Installation Condition Report to BS 7671, renewed at least every 5 years.
  • EPC — Valid Energy Performance Certificate; must be E or above, or a registered exemption in place within 3 months of the licence.
  • Fire risk assessment — Suitable and sufficient assessment under the Regulatory Reform (Fire Safety) Order 2005, produced to the council on demand.
  • Furniture and furnishings fire-safety declaration — Signed declaration that soft furnishings comply with the Furniture and Furnishings (Fire)(Safety) Regulations 1988, due within 3 months of the licence being issued.

Sources

Compiled from the council’s own published pages and documents; data reviewed September 2026. Rules and fees change, so always confirm with Royal Borough of Greenwich before applying. This is general information, not legal advice.